Futuristic lighting will shimmer in such a way as if the facade of the building speaks to people and inspires that the possibilities can be endless.
⠀
Decorative lighting is being installed in the First Tower, work is underway on interior decoration and landscaping. In the Second Tower the area of the facade glazing is increasing, more than 2,700 sq. m double-glazed windows and more than 3,500 sq. m of translucent structures. Meanwhile, in the Third Tower monolithic work is underway.