30.04.2020

Stages of construction

We continue to build the future we want to live in

In the First Tower, the glazing of the treadmill dome is performed. Residents will be able to jog at a bird’s eye view.

A monolith is being built on the 30th floor of the Second Tower, and from the 4th to 19th floors the installation of facade-profile systems for glazing continues.

In the Third Tower there are monolithic works on the -2 floor.