First Tower put into operation

First Tower put into operation 1
First Tower put into operation 2
First Tower put into operation 3
menu

19.12.19

Installation of ventilation systems is underway in the Second Tower

 

First Tower put into operation 6

 

First Tower put into operation 7

Glazing of the facade in the First Tower is in full swing. More than 8,000 m² of panoramic multifunctional double-glazed windows of the American brand The Guardian Glass Industries have already been installed. The last ceiling of the open terrace of the panoramic lounge restaurant is concreted.

In the Second Tower, work is underway on the installation of ventilation systems, brickwork, as well as the construction of the stylobate part. Meanwhile, work on the pile field has been completed in the Third Tower and drainage systems are being installed under the stain of the apartment building.