First Tower put into operation

First Tower put into operation 1
First Tower put into operation 2
First Tower put into operation 3
menu

13.11.19

5400 m2 of double-glazed windows were installed and 8 600 m2 of facade systems were prepared for glazing

 

This amazing warm autumn, walking in the center of Kiev, you can catch glare of the reflection of the sun from Taryan Towers, because 5400 m2 of double-glazed windows have already been installed and 8600 m2 of facade systems have been prepared for glazing. Work is also underway on the installation of fencing balconies. The second tower rises to 19 floors, and the third tower is working on a pile field.First Tower put into operation 6

First Tower put into operation 7