In the First Tower, the glazing of the treadmill dome is performed. Residents will be able to jog at a bird's eye view.
A monolith is being built on the 30th floor of the Second Tower, and from the 4th to 19th floors the installation of facade-profile systems for glazing continues.
In the Third Tower there are monolithic works on the -2 floor.