The opportunity to touch the future is getting closer.
In the First Tower, finishing works, both inside the residential complex and outside. Improvement of the territory is in full swing and 750 sq.m. natural stone is paved. The exterior of the entrance lobby will convey the futuristic atmosphere of Taryan Towers.
In the Second Tower, the glazing of the facade continues, and in the Third, the monolithic works of the third floor
(of the sixth actual floor, including the parking lot) are underway.