18.06.20

The glazing of the facade of the Second Tower has begun

 

In the First Tower, work is underway on the device of fire, low-voltage, electrical networks of the residential part.

Finishing work is also ongoing in the lobby and elevator halls.

In the Second Tower, the glazing of the facade has begun. In the Third Tower monolithic work are in process.First Tower put into operation 6

 