First Tower put into operation

First Tower put into operation 1
First Tower put into operation 2
First Tower put into operation 3
menu

29.11.17

The brickwork of the minus floors was started, the construction of the electrical networks of the building started

The brickwork of the minus floors was started, the construction of the electrical networks of the building started.

First Tower put into operation 6